Northcote House 1 - extension

Brief:

To renovate the existing bathroom as stage 1 of a larger project.

Design Constraints:

To work within the existing boundaries of the existing boundary to retain the plumbing below the floor.

Design Resolution:

We ended up extending the bathroom out to the boundary to make the bathroom bigger and create a shower that did not need a shower screen and take up some dead space between the house and the boundary.

Design, Documentation: 6 weeks

Construction: 2 months (as part of renovating the front part of the house)