South Melbourne House 4 - joinery installation
Brief:
To install new TV joinery and storage to living room.
Design Constraints:
To work within the existing constraints of a 3rd floor established living room.
Design Resolution:
The new joinery was on the third floor of this 3 storey town house so large elements had to be considered.
Design, Documentation: 15 weeks
Construction: 4-6 weeks